A new, watertight stainless steel pool built inside the existing shell. Less breaking out, a shorter closure, and a pool that meets current standards.

Renovated 50-metre pool with movable bulkhead

Enquire about our products

    What can we do for you? *

    I am interested in *

    Message *

    Personal information

    Name *

    Country *

    E-mail address *

    Phone number

    When the concrete pool reaches its limits

    Many public pools in the Netherlands and Belgium were built in the 1970s and 1980s. After decades of use the same issues appear: leaking basins, deteriorating tiles and joints, gutters that no longer meet current requirements, and maintenance that returns every few years.

    Full reconstruction means demolition, a long closure and a large budget. For most owners and operators the question is whether there is a responsible alternative. In many cases there is.

    How pool renovation with RenovAction works

    RenovAction is Myrtha’s renovation technology. It places a new stainless steel pool structure within the existing concrete shell. The original shell stays in place and acts as the base.

    Stainless steel rails

    Rails are fixed along the existing walls and aligned precisely. Where the original pool dimensions must be kept, for example for competition lengths, the rails can be recessed into the wall.

    Spacers

    High-density spacers between the old wall and the new panels absorb irregularities in the concrete, so the new structure stands straight and stable.

    PVC-laminated panels

    The new walls consist of stainless steel panels with a hard PVC layer laminated in the factory. They are bolted to the rails. No structural welding is done on site.

    Continuous waterproofing

    The floor is lined with a reinforced PVC membrane. Panel joints and wall-to-floor connections are hot-welded, creating one continuous watertight layer from wall to floor.

    New overflow gutter

    The stainless steel gutter can be placed in the existing channel or along the new perimeter, depending on the overflow system required.

    What it means for owners and operators

    • Limited demolition. The existing shell is kept; work is focused on the pool itself.
    • Shorter closure. Prefabricated components and a bolted assembly allow a shorter installation period than full reconstruction.
    • Room to redesign. Within the existing structure, depths, pool edges and activity zones can be reconsidered, for example adding a shallow zone or a movable bulkhead.
    • Compliance with current standards. Renovation is an opportunity to bring gutters, circulation and competition dimensions up to date.
    • Partial renovation is possible. Sometimes only the perimeter or the gutter needs renewing. We assess what is necessary, not what is possible.

    RenovAction in the BeNeLux

    Myrtha has renovated pools in the region with RenovAction since 2010. A selection:

    Pool Location Year Scope
    Twentebad Hengelo (NL) 2018 50 × 21 m Olympic-size pool, depth up to 3.79 m, movable bulkhead; circulation redesigned using CFD analysis
    Couvin swimming pool Couvin (BE) 2022 25 m fitness pool and children’s pool, Soft Floor non-slip bottom
    Zwemparadijs De Scheg Deventer (NL) 2015 Renovation of a municipal pool
    Zwembad Molenkoog Den Burg, Texel (NL) 2015 Renovation of a municipal pool
    De Tobbe Slochteren (NL) 2013 Renovation of a municipal pool

    Want to see a renovated pool in operation? We are happy to arrange a visit to a reference site.

    Design & Build: one party from survey to handover

    A renovation starts with an honest assessment of the existing pool. From there, EWAC Pools takes responsibility for the whole process.

    • We design. We survey the existing shell and translate your requirements and the options of Myrtha technology into one plan, together with you, your architect or adviser, and Myrtha’s engineering team.
    • We build. Our team installs the rails, panels, membrane and gutter on site and finishes the pool through to handover.
    • We guide. One point of contact who manages the planning and the site, with short lines of communication and a Dutch-speaking team in the BeNeLux. After handover we remain responsible for after-sales, service and maintenance.

    EWAC Pools is the authorised Myrtha dealer for the BeNeLux and brings more than 30 years of experience in stainless steel construction and water engineering. Myrtha supplies the product engineering and manufactures the components.

    Considering a renovation?

    Send us the basic details of your pool: dimensions, year of construction and the main issues. We will give you a realistic view of the options, including when renovation is not the right choice.